A+ A A-

01-21-2013

NECO-JMcE-001b

Rate this item
(0 votes)

In this scenario you return with the loaded cars from the lumber camp to the yard.

You must watch your speed on the curves.

Make your way down the valley.

Pick up 2 more loaded cars.

Drop the cars off in the yard.

Your power is SW1200 #1215.

Additional Info

  • Version: 1
  • Designer: John McEwen
  • Route: C&O Alleghany
  • Duration: 25 minutes
  • Start time: 09:30
  • Season: Summer
  • Weather: Clear
  • Engine assigned: SW1200
  • Class of Work Order: Freight
  • Type of Work Order: Switching
  • Release Date: Monday, 21 January 2013
  • Requires Payware: No
  • File Size: 17kb
Last modified on January 23, 2013, 4:40 pm
HOT NEWS

Visitors Counter

4684588
Today
This week
This month
Last month
3676
3676
62478
174501

Your IP: 3.231.212.98

blue green orange red

Copyright 2012-2014 by Mutagenix - A subsidiary of the NERR Network. Best viewed at 1280 x or more.