01-21-2013

NEPA-DH-005

Rate this item
(0 votes)

In this scenario you pick up 3 sets of hoppers,load them and set them out.

The weather is terrible.

You pick up hoppers on siding5, load them and set them out on siding2.

Then you park the power on the other side of the main.

Your power is SW1500 #1504.

Additional Info

  • Version: 1
  • Designer: Dave Horton
  • Route: NERW PA Division
  • Duration: 50 minutes
  • Start time: 12:00
  • Season: Winter
  • Weather: Snowing
  • Engine assigned: SW1500
  • Class of Work Order: Freight
  • Type of Work Order: Switching
  • Release Date: Monday, 21 January 2013
  • Requires Payware: No
  • File Size: 40kb
Last modified on January 23, 2013, 4:39 pm
HOT NEWS

Visitors Counter

4512051
Today
This week
This month
Last month
4446
27482
64442
90549

Your IP: 18.206.194.210

blue green orange red

Copyright 2012-2014 by Mutagenix - A subsidiary of the NERR Network. Best viewed at 1280 x or more.